
For designers & specifiers
How to specify
DrainShield.
Start with the project requirements.
We’ll help you confirm the right configuration.
Authority requirements
Confirm the local trade-waste authority’s acceptance and sizing requirements.
Wastewater load
Provide fixture numbers, peak flow and the nature of the trade waste.
Capacity and model
Select the DrainShield model and required working capacity.
Installation type
Nominate above-ground or below-ground installation and available space.
Plumbing and access
Coordinate pipework, venting, sampling and pump-out access.
Operations
Confirm cover loading where relevant and the required maintenance schedule.
Complete the bracketed project details and confirm the selected model with Protector.
Final dimensions, capacities and installation details are established in the approved project drawings and current manufacturer documentation.
Request a project-specific specification
