Retain forecourt spills
The front chamber captures sediment and free oil. The water-supported ACD ball descends as the oil layer deepens and closes the forecourt transfer for spill recovery.
Protector Australia
Oil & water separation
Full retention. Coordinated stormwater treatment.
Forecourt spill retention up front. General site stormwater treatment downstream. Two drainage streams, brought together in one extended FRP unit.
Product selection · Project drawings · Technical support

The system, explained
HydroStorm combines a front full retention and spill-storage chamber, a middle sediment chamber and a downstream coalescing bypass separator. Forecourt runoff enters through the end inlet; general site runoff enters separately through the side. Treatment duty, usable spill storage and peak bypass flow are specified separately.
Explore our engineering supportHow it works
The front chamber captures sediment and free oil. The water-supported ACD ball descends as the oil layer deepens and closes the forecourt transfer for spill recovery.
A separate full-size side inlet feeds the sediment chamber. Water passes down through the coalescing filter, then rises to the outlet.
Excess downstream flow draws from mid-water level and rises through the bypass tube. The bypass sits downstream of the forecourt retention chamber and ACD transfer.
Where it fits
Inside HydroStorm
Explore the actual three-chamber arrangement. Select a condition to see how the front retention chamber and downstream bypass separator work together.
Swipe the illustration to inspect the full unit ↔
Forecourt runoff enters the front chamber. Sediment settles and free oil rises. Water enters the low slots in the ACD tube, drops down, then rises over the transfer and through the gap into the sediment chamber. General site runoff enters separately from the side. Small amounts of runoff oil are skimmed through the downcomer into downstream oil capture. Water travels down through the coalescing filter, then rises to the outlet.
Low ACD slots → down → up and over. Down through the filter → up to the outlet.
For designers & specifiers
Start with the project requirements.
We’ll help you confirm the right configuration.
Provide the forecourt/apron and general site catchments, flows and pollutant risks separately.
Nominate design treatment flow and peak site/bypass flow as separate requirements.
Confirm 6,000, 8,000 or 10,000 L proposed usable storage, closure level and upstream response to ACD closure.
Coordinate the forecourt end inlet, full-size site side inlet, outlet, pipe sizes, inverts, head and tailwater.
Provide groundwater, cover and traffic loads, anchoring, access covers, pump-out and coalescer/ACD service access.
Obtain the current model drawing, verified duties and volumes, structural design and applicable performance documentation.
Complete the bracketed project details and confirm the selected model with Protector.
Final dimensions, capacities and installation details are established in the approved project drawings and current manufacturer documentation.
Request a project-specific specificationProposed model range
Four treatment families, with front spill-storage options selected separately. Start with a configuration, then coordinate it with the project hydraulics.
| Model family | Proposed treatment duty | Usable spill storage options |
|---|---|---|
| HydroStorm 20 | 15–20 L/s | 6,000 / 8,000 / 10,000 L |
| HydroStorm 30 | 30 L/s | 6,000 / 8,000 / 10,000 L |
| HydroStorm 50 | 50 L/s | 6,000 / 8,000 / 10,000 L |
| HydroStorm 100 | 100 L/s | 6,000 / 8,000 / 10,000 L |
Proposed selection range. Treatment duties, usable spill storage, tank dimensions and full-size pipe connections require confirmation on the approved model drawing. Peak bypass capacity is a separate project requirement.
Start a project brief
Choose a proposed family and spill capacity to prepare an enquiry. Final sizing also needs peak flow, available head, inverts and site conditions.
Supporting HydroProtector platform evidence
UniSA’s Australian Flow Management Group tested a full-scale HydroProtector oil-water separator using the reported EN 858-1:2002 procedure. The test used low-sulphur diesel, with five outlet samples analysed by ALS. [1]
The reported result supports the underlying separation technology. It is the starting evidence for the combined HydroStorm design, with its final duty, retention and bypass arrangement confirmed for each model.

Mean outlet TRH
Tested HydroProtector unit [1]
Highest outlet TRH
Five samples reported [1]
Test flow
HYD.8.DC.R2-1 [1]
HydroStorm / Technical documentation / Revision F
Connections, operation, selection and maintenance.
HydroStorm combines an upstream full retention and spill-storage chamber with a downstream sediment chamber and coalescing bypass separator in one extended FRP unit. The arrangement adds a front retention section to the bypass separator configuration.
Forecourt and apron runoff enters the front chamber through the end inlet. Sediment settles and free oil rises here. An automatic closure device (ACD) controls transfer through low tube slots, down through the base and up over the transfer into the downstream sediment chamber.
Car park and general site runoff enters through a separate, full-size connection in the side of the sediment chamber. The design treatment flow passes through the coalescer, while higher downstream flows use the internal bypass.
Key arrangement: the general site inlet enters the middle chamber from the side. The front full retention section sits upstream of the bypass separator. The bypass is downstream of the forecourt retention and ACD transfer.
Coordinate the entire drainage system before manufacture. Pipe diameters and inverts follow the approved project design.
| Interface | Function | Confirm for the project |
|---|---|---|
| A · Forecourt inlet | End entry to the front full retention chamber | Apron catchment, inflow, pipe diameter, inlet invert and upstream storage / surcharge behaviour |
| ACD-controlled transfer | Normal transfer from front chamber to sediment chamber; closes at the nominated spill-storage limit | Usable spill storage, closure level, available head, transfer route and inspection access |
| B · General site inlet | Full-size side entry to the sediment chamber | Full site peak flow, connection size, invert, approach direction and interaction with downstream levels |
| Coalescing treatment | Oil-water separation at the selected design treatment flow | Duty, filter configuration, hydraulic head and service access |
| Internal bypass & outlet | Downstream peak-flow conveyance and final discharge | Peak bypass flow, outlet capacity, inverts, tailwater and discharge conditions |
The same settlement, oil-skimming and coalescing processes continue. Excess stormwater is drawn from mid-water level, between the floating oil and settled sediment. This water rises through the bypass tube and leaves through the high-flow overflow.
The internal bypass is downstream of the front retention and ACD-controlled transfer. Confirm peak bypass capacity, operating levels and outlet conditions for the project.
Spilled oil forms a layer above the water in the front retention chamber. As this layer deepens, the oil–water interface moves down. The ACD ball floats in water, not in oil, and follows that interface down until it seats at the bottom of the tube, closing transfer from the forecourt chamber. Once seated, it remains closed for spill recovery.
The separate car-park and general site inlet continues to feed the downstream separator. Settlement, oil capture and coalescing treatment continue; the internal bypass remains available when downstream flow requires it. The illustration shows this continuing site flow while the forecourt transfer is closed.
Return to service: follow the site incident procedure, recover retained oil and contaminated liquid, inspect the chamber and ACD, and complete the manufacturer’s checks before reopening the system. Address upstream storage and surcharge in the project design and incident plan.
Select treatment duty and usable spill storage separately. Nominal tank volume is not the same as verified usable spill storage.
| Proposed family | Treatment duty | Spill options |
|---|---|---|
| HydroStorm 20 | 15–20 L/s | 6,000 / 8,000 / 10,000 L |
| HydroStorm 30 | 30 L/s | 6,000 / 8,000 / 10,000 L |
| HydroStorm 50 | 50 L/s | 6,000 / 8,000 / 10,000 L |
| HydroStorm 100 | 100 L/s | 6,000 / 8,000 / 10,000 L |
Configuration example: SP.50.TC.R5-2.FR10000 — 50 L/s treatment with a nominated 10,000 L front spill-retention chamber. Final usable volume and model geometry require confirmation.
Overall length combines the selected bypass separator section with the added front full retention section. Dimensions, connection orientations and operating levels are set by the approved project drawing.
Selection status: model families and spill options are proposed. Confirm final capacities, hydraulic performance, structural design and discharge requirements for the selected HydroStorm model.
Set maintenance frequency from site conditions, pollutant loading and the manufacturer’s operating instructions. Confirm safe access and servicing arrangements before installation.
| Check | Purpose |
|---|---|
| Front chamber | Inspect retained oil, sediment and available spill storage. Arrange removal before storage is compromised. |
| ACD & monitoring | Check condition, free movement, closure function and any installed oil monitoring in accordance with manufacturer instructions. |
| Sediment chamber | Inspect and remove accumulated sediment; keep the side inlet and transfer paths clear. |
| Coalescer | Inspect, clean or service the media and associated pipework as instructed. |
| Bypass & outlet | Check for blockage, damage and obstructions affecting high-flow conveyance. |
| After a spill | Implement incident response, recover retained contaminants, inspect the unit and verify ACD operation before return to service. |
Keep inspection, pump-out, cleaning, monitoring and incident records as part of the site operating documentation.
The following issued reports form the supporting technical basis referenced in Revision F. Full reports may be requested from Protector; source reports and drawings are not appended to the brochure.
Full-scale oil-water separation test using the reported EN 858-1:2002 procedure, low-sulphur diesel and an oil challenge of 5 mL per litre of water. After the run-in period, five outlet samples were collected at one-minute intervals.
| Outlet sample | TRH (mg/L) |
|---|---|
| 1 | 4.86 |
| 2 | 2.49 |
| 3 | 2.15 |
| 4 | 1.53 |
| 5 | 1.91 |
| Mean | 2.59 |
UniSA concluded that the tested HydroProtector met the Class 1 separation requirements under the stated conditions. The reported Class 1 criteria were a mean below 5 mg/L and no sample above 10 mg/L. All five reported TRH samples were below 5 mg/L.
Source locations: pp. 3, 5–11 and Appendix C. TRH values are used throughout this guide; they should not be confused with the report’s separate TPH results.
Addresses HydroProtector inlet, ACD, baffle, coalescer and outlet losses, retention-time and filter scaling, and available hydraulic head. Supports selection and hydraulic coordination of the reviewed product family.
Source locations: pp. 4, 7 and 11–14.
Reviews HydroProtector information, test results and fuel-site requirements. Supports the use of HydroProtector for petrol-station applications, with site-specific assessment.
Source locations: pp. 9–10.
Evidence and accreditation scope. These reports relate to the tested HydroProtector and its reviewed family. They support the separation technology and hydraulic design approach. They do not establish whole-unit HydroStorm certification or verification of every proposed HydroStorm duty, bypass flow or 6,000–10,000 L usable spill option.
Report 21004A states that AFMG separator performance testing was outside its NATA-accredited scope. Effluent analysis was undertaken by ALS, a NATA-accredited laboratory.
HS-TC / Revision F / November 2026 · Protector Australia Pty Ltd
Technical enquiries: sales@protector.com.au · 1300 585 787
Downloads & technical support
Access product documents or ask our team for the current package for your project.
Download the eight-page HydroStorm product overview, operating sequence, model range and evidence register.
Download brochure · PDF Technical guideReview the design inputs, operating sequence, service requirements and supporting report register.
Read the technical guide Project-specific packageRequest the current model drawing, confirmed capacities and specification for your project.
Request technical package Related systemExplore the existing full-retention oil-water separator.