
For designers & specifiers
How to specify
HydroProtector.
Start with the project requirements.
We’ll help you confirm the right configuration.
Design flow
Confirm the design treatment flow in L/s and the contributing catchment.
Spill containment
State the required oil spill capacity, in litres, based on the site risk assessment.
Separator arrangement
Nominate full retention, the coalescer, flame trap and automatic closure device.
Connections and levels
Provide pipe diameters, inlet and outlet invert levels and finished surface level.
Site and access
Confirm groundwater, cover loading, excavation, lifting and pump-out access.
Documents and alarms
Request the model-specific drawings, certification, installation and maintenance manuals; define alarm requirements.
Complete the bracketed project details and confirm the selected model with Protector.
Final dimensions, capacities and installation details are established in the approved project drawings and current manufacturer documentation.
Request a project-specific specification
