Skip to product information
1 of 1

Protector

HydroProtector-

HydroProtector-

Regular price $0.00
Regular price Sale price $0.00
Sale Sold out
Engineering & manufacturing

Engineering & manufacturing

In-house testing

In-house testing

Australian owned & operated

Australian owned & operated

Quality-focused production

Quality-focused production

View full details

For designers & specifiers

How to specify
HydroProtector.

Start with the project requirements.
We’ll help you confirm the right configuration.

  1. Design flow

    Confirm the design treatment flow in L/s and the contributing catchment.

  2. Spill containment

    State the required oil spill capacity, in litres, based on the site risk assessment.

  3. Separator arrangement

    Nominate full retention, the coalescer, flame trap and automatic closure device.

  4. Connections and levels

    Provide pipe diameters, inlet and outlet invert levels and finished surface level.

  5. Site and access

    Confirm groundwater, cover loading, excavation, lifting and pump-out access.

  6. Documents and alarms

    Request the model-specific drawings, certification, installation and maintenance manuals; define alarm requirements.

Suggested specification wording

Complete the bracketed project details and confirm the selected model with Protector.

Supply a Protector HydroProtector full-retention oil-water separator, model [MODEL], designed for a treatment flow of [FLOW] L/s and an oil spill capacity of [CAPACITY] L. Provide FRP construction, flame trap inlet, automatic closure device and coalescer arrangement. Confirm the model-specific EN 858 performance documentation. Connections, cover loading, alarm provision and installation shall be as shown on the approved project drawings and current manufacturer instructions.

Final dimensions, capacities and installation details are established in the approved project drawings and current manufacturer documentation.

Request a project-specific specification