
For designers & specifiers
How to specify
EcoProtector.
Start with the project requirements.
We’ll help you confirm the right configuration.
Pollutant objectives
Confirm gross pollutant and sediment treatment objectives.
Design flows
State treatment flow and peak bypass flow.
Storage volume
Select pollutant storage capacity and a maintenance interval suited to the catchment.
Network connection
Provide pipe sizes, orientation, invert levels and downstream constraints.
Site conditions
Confirm cover loading, groundwater, excavation and backfill requirements.
Access and documentation
Provide pump-out access and request model-specific drawings and maintenance instructions.
Complete the bracketed project details and confirm the selected model with Protector.
Final dimensions, capacities and installation details are established in the approved project drawings and current manufacturer documentation.
Request a project-specific specification
